11-12-26
|
Project Photographs & Digital Photo Log
Design Deliverables > Submittal Requirements > Software Requirements:
|
Updated to reflect current photo requirements according to Division 1 Specifications 01 32 33 Photo Documentation, including new version of the Digital Photo Log.
|
|
11-12-26
|
Division 1 Specifications > 01 32 33 Photo Documentation
|
Corrected and deleted outdated requirement.
|
|
11-3-26
|
Division 1 Specifications
- 01 32 33 Photo Documentation
- 01 77 00 Closeout Procedures
- 01 79 00 Demonstration and Training
|
Updated requirements for submitting photos and videos on NPS project management and communication software.
|
|
11-3-26
|
Class C Uniformat Construction Cost Estimate
Class B & A MasterFormat Construction Cost Estimate
|
Updated Park Location Factors (PLF).
|
|
10-19-26
|
Class B & A MasterFormat Construction Cost Estimate
|
On CLIN (Contract Line Item Number) and OPTIONS worksheets, updated calculations:
- Totals for Division 8 Total Openings
- Total for Federal Wage Rate Factor located under Markups and Factors section
|
|
9-29-26
|
Division 1 Specifications
- 01 35 23 Safety Requirements
|
Updated to address fire safety during construction and use of batteries on construction sites.
|
|
9-29-26
|
Class C Uniformat Construction Cost Estimate
|
On CLIN (Contract Line Item Number) and OPTIONS worksheets > Markups and Factors section, updated calculation:
- Total for Federal Wage Rate Factor
|
|
9-10-26
|
Accessibility & Universal Design Standards
|
Added:
- Federal Highway Administration (FHWA)
|
|
9-1-26
|
Permitting Assessment Form (PAF) |
Moved topics Hot Work Permit and Occupancy Requirements from Design Topics section to Construction Topics section.
|
|
8-31-26
|
Construction Inspection Checklist (Phase 1 projects only)
Design-Bid-Build (DBB)
Design-Build (DB)
Design Templates
|
Deleted Construction Inspection Checklist (Phase 1 projects only) deliverable which is no longer required.
|
|
8-11-26
|
Permitting
|
New Permitting page including updated DSC Project Permitting Process (PPMP).
DSC developed the Project Permitting Management Process (PPMP) to meet the requirements of External Regulatory Permitting with 4 phases: Permit Scoping, Permit Planning, Permit Acquisition Services and Compliance with Issued Permits.
|
|
5-21-26
|
CMR & CQC Daily Report
(Construction Management Representative & Contractor Quality Control)
2.4.2 CMR & CQC Daily Reports
|
Added requirements in CMR & CQC Daily Report > Safety Comments section.
|
|
5-19-26
|
2. Construction Activities
|
Updated policy for acceptance testing and inspections:
- Before occupancy, the designated NPS Authority Having Jurisdiction (AHJ) Fire Code Official (FCO) and Building Code Official (BCO) conduct acceptance testing and inspections.
Removed outdated forms Backflow Prevention Assembly Test (BF-1), Certificate of Occupancy (CO-1), and Fire/Smoke Damper Acceptance (FSD-1).
|
|
5-18-26
|
Electrical Engineering Design Standards
Lighting Design Standards
|
Updated to NFPA 70, NEC 2026 (National Fire Protection Association, National Electric Code).
|