DB 4.0 Construction Documents (CD)

4.0 DB Design Development (DD) Documents and DB Construction Documents (CD)

The Architect/Engineer (A/E) shall exclude Brand Name materials from specifications and utilize salient characteristics to the maximum extent practicable. When Brand Name is required to ensure quality of design, and the A/E suspects [based on market research] that suitable equal materials are likely available from other manufactures, the A/E shall identify the item as “Brand Name or Equal,” and include the salient physical, functional, or performance characteristics that will satisfy the design requirements in the specifications in the following format:

[Brand Name; Part Number; Etc.] Brand Name or Equal Salient Characteristics that an equal must meet are delineated below:

Physical: (All physical characteristic that an equal must meet shall be included here).

Functional: (All functional characteristic that an equal must meet shall be included here)

Performance: (All functional characteristic that an equal must meet shall be included here).

If any of the above mentioned characteristic categories (physical, functional, or performance) are not applicable, “None” shall be used to denote that no salient characteristics apply to that specific brand name or equal description.

Permitting

The Architect/Engineer is responsible for leading the DSC Project Permitting Management Process (PPMP) and shall:

  • Select a Permitting Lead.
  • Review previously developed permitting documents (Permitting Assessment Form (PAF), Permitting Road Map, and Permit Plans).
  • Continuously update documents to reflect project changes.
  • Conduct Permit Acquisition Service:
    • Initiate Permit Acquisition Services: Initiate Permit Acquisition Services if during permit scoping, permits reliant on the design were identified. Permits are part of design responsibility.
    • Prepare Permit Schedule: Review permit list to be used in Division 1 Specifications 01 31 00 Project Management and Coordination. Prepare a Permit Schedule using the timelines developed in the Permit Plans.
    • Develop Application for each Required Permit: Develop an application for each required permit on the Permitting Road Map and include required documents and products. Consult with the appropriate Agency for each permit. Bring any permit issues to the interdisciplinary team (IDT) for resolutions. Provide a draft application for each Permit to the IDT for review prior to submitting it to the associated Agency. Finalize the application by incorporating comments from the IDT review.
    • Initiate Permit Acquisition and Provide Final Permits: Obtain Permits identified in the updated Permit Plans. Proactively manage the DSC PPMP to ensure each permit is issued within the identified timeline. Submit draft permit applications to NPS staff for review. Consult with the interdisciplinary team (IDT) to prepare and submit application and documents required by the Agency and resolve any comments. Provide original versions of all issued permits to NPS by the required date.

4.1 DB Design Development (DD) Documents

4.1.1 Prepare DB Design Development (DD) Documents

Based on Request for Proposal (RFP) Documents, prepare:

Templates:

Guidelines:

4.1.2. Submit DB Design Development (DD) Documents for Review

  • DB Design Development Drawings
  • Divisions 2 through 49 Outline Specifications
  • Product File
  • Statement of Structural Tests and Special Inspections
  • Construction Inspection Checklist (Phase 1 projects only)
  • Permitting
    • Permitting Updates and Documentation
    • Permit Acquisition Services (if required)
      • Permit Schedule
      • Permit Application for Design Permits
      • Permit Status and/or Final Permits
  • Checklists for internal review of drawings, specifications, calculations, and cost estimates
    • Required documents for each submission are included and complete per contract requirements.
    • Required documents have been through a Quality Control (QC) review. NPS requires documentation and submittal of QC work performed.

4.2 Compliance Deliverables

4.2.1 Compliance Drawings and Supporting Narrative

When required, prepare and submit drawings and supporting narrative for obtaining Section 404, National Pollutant Discharge Elimination System (NPDES), and other permits.

Resolve reviewing agencies comments, as required.


4.3 DB Construction Documents (CD)

4.3.1 Prepare 100% Draft DB Construction Documents (CD)

Based on DB Design Development Documents and resolutions of DB Design Development Documents review comments, complete:

  • DB Construction Drawings
  • Divisions 2 through 49 Construction Specifications
  • Product File
  • Statement of Structural Tests and Special Inspections
  • Design Calculations
  • Construction Inspection Checklist (Phase 1 projects only)
  • Follow DSC PPMPP
  • Checklists for internal review of drawings, specifications, calculations, and cost estimates
    • Required documents for each submission are included and complete per contract requirements.
    • Required documents have been through a Quality Control (QC) review. NPS requires documentation and submittal of QC work performed.

Follow requirement for formatting of brand name or equal salient characteristic as described under section 4.1.1 above.

Templates:

Guidelines:

4.3.2 Submit 100% Draft DB Construction Documents (CD) for Review

  • 100% Draft DB Construction Drawings
  • Divisions 2 through 49 Construction Specifications
  • Product File
  • Statement of Structural Tests and Special Inspections
  • Design Calculations
  • Construction Inspection Checklist (Phase 1 projects only)
  • Permitting
    • Permitting Updates and Documentation
    • Permit Acquisition Services (if required)
      • Permit Schedule
      • Permit Application for Design Permits
      • Permit Status and/or Final Permits
  • Checklists for internal review of drawings, specifications, calculations, and cost estimates
  • NPS DSC Quality Assurance (QA) Review Comments form with responses to DB Design Development Documents review comments

4.3.3 Submit 100% Complete DB Construction Documents for Final Approval

Resolve 100% Draft DB CD review comments and incorporate resolutions into 100% Complete DB CD. Submit 100% Complete DB CD and responses to 100% Draft DB CD review comments for final approval.

4.3.4 Submit Complete Stamped and Signed DB Construction Documents (CD)

Resolve 100% Complete DB CD review comments. Upon final approval of 100% Complete DB CD, submit the following record set for NPS archiving and general use:

  • DB Construction Drawings
  • Divisions 2 through 49 Construction Specifications - Architect-Engineer (A/E) team to stamp and sign cover sheet.
  • Product File
  • Statement of Structural Tests and Special Inspections
  • Supplemental Design Reports (if applicable)
  • Design Calculations
  • Construction Inspection Checklist (Phase 1 projects only)
  • Final Permits
  • Checklists for internal review of drawings, specifications, calculations, and cost estimates
  • NPS DSC QA Review Comments form with responses to 100% Complete DB CD review comments
 