Road will open at 9am. All vehicles must carry chains. The uphill gate closes at 4pm; all vehicles must be below the entrance station by 5pm. Ski area closed. Children’s sledding area open. No potable water, or food service are available.
Hoh Rain Forest area will reopen when county road is repaired - 3/13/25
Olympic National Park will begin restoring essential services to the Hoh Rain Forest once the Upper Hoh Road, which is maintained by Jefferson County, is safe for travel. Until then, the area is closed to all traffic, including pedestrians & bicycles. More
Fall closures make way for improvements on Hurricane Ridge Road and Obstruction Point Road
In September and October 2022, closures will occur on Hurricane Ridge Road and Obstruction Point Road.
You are viewing ARCHIVED content published online before January 20, 2025.
Please note that this content is NOT UPDATED, and links may not work. For current information,
visit https://www.nps.gov/aboutus/news/index.htm.
Obstruction Point Road, pictured here, will undergo construction in the fall of 2022.
PORT ANGELES, Wash. – In fall 2022, a road work project at the Hurricane Ridge area of Olympic National Park will improve safety and accessibility in this heavily-visited area of the national park. Work will begin on September 6, 2022, and will conclude on October 27, 2022. Obstruction Point Road and part of Hurricane Ridge Road will be closed to the public while work is underway. The last day of summer operations at the Hurricane Ridge Visitor Center will be Thursday, September 15, 2022.
A $1.7 million contract for this project was awarded to Bruch and Bruch Construction of Port Angeles, Washington. Work will include widening Obstruction Point Road to provide a safe vehicle width. On Hurricane Ridge Road, a reinforced soil slope wall will be installed to secure unstable soils near the road. Electrical and fiber optic lines in the work area will be relocated.
Due to narrow road widths and the types of repairs being conducted, it is not possible to provide public access to these areas during construction. During closures, roads will be closed to all vehicle, bicycle, and pedestrian traffic.
Closures on Obstruction Point Road
Location: Obstruction Point Road will close at its junction with Hurricane Ridge Road.
Duration: Obstruction Point Road will close on Tuesday, September 6, 2022, at 7 am and will remain closed for the rest of the 2022 season.
Closures on Hurricane Ridge Road
Location: Hurricane Ridge Road will close to the public at the Heart O' the Hills Entrance Station.
Duration: Beyond the Heart O' the Hills Entrance Station, Hurricane Ridge Road will be closed September 16 to October 21, 2022.
Nearby Areas
The Heart O' the Hills area, including the Heart O' the Hills Campground, will remain open.
The Olympic National Park Visitor Center and Wilderness Information Center, located at 3002 Mount Angeles Road, Port Angeles, WA 98362, will remain open. Learn more here.