Restoration of the Merced River in Yosemite Valley

Looking east toward Stoneman Bridge and Half Dome
Summer flows in the Merced River downstream of Stoneman Bridge and Half Dome.
 
 
 

The Merced Wild and Scenic River Final Comprehensive Management Plan and Environmental Impact Statement (MRP) addresses the renowned Merced Wild and Scenic River's 81 miles within Yosemite National Park and the El Portal Administrative Site and functions as the guiding document to protect and enhance river values and manage use within the river corridor for the next 20 years. The MRP protects and enhances river values by a series of initial actions to address immediate concerns and a commitment to a monitoring program to ensure that river values remain protected over time.

Merced River Restoration Study

The cooperative project between National Park Service (NPS) and the University of California Santa Barbara was driven by guidance in the Merced River Plan to evaluate the range of impacts to the Merced River through Yosemite Valley, to develop a restoration strategy in collaboration with stakeholders, and to provide specific guidelines and designs to implement restoration. The team was specifically asked to perform further hydrologic impact studies to determine the effects of Sugar Pine Bridge “on the river’s alluvial nature” as called for in the MRP. However, the effects of any single structure on a river can only be understood in its broader watershed context, because conditions well beyond the geographical limits of a single reach will exert profound influence on the river flow and its channel. Thus, the scope of this project extends to the upstream boundaries of the Merced River watershed, with particular attention being paid to the three river miles between Happy Isles Bridge and Sentinel Bridge. This stretch is among the most heavily visited areas of Yosemite National Park, where a variety of natural resources, cultural resources, and human impacts exist.

Additional Information Related to Merced River Restoration Study

Ecological Restoration

Ecological restoration addresses the National Park Service (NPS) mission to allow natural processes to prevail, as well as protecting scenery and historic resources; it also addresses the goals of the Wild and Scenic Rivers Act by enhancing river free-flow, water quality and physical and ecological outstandingly remarkable values. Ecological restoration actions in riparian, riverine, and meadow habitats enhance the open, scenic quality which provides a sense of place for reflection and inspiration.

 
Restoration worker holding native plant plugs near river
A restoration worker inspects native plant plugs that were grown for a riverbank restoration project.
 

Restoration Goals

In addition to the overarching ecological restoration goal, the following are specific restoration goals of the Merced River Plan:

  • Restore hydrologic function and connectivity with the floodplain including meadow and wetland habitats.
  • Restore overbank flooding frequency by narrowing widened river channel.
  • Repair eroded riverbanks, restore riparian plant communities and prevent further human-caused, erosion-induced widening.
  • Improve hydrologic conditions at bridges during peak flow periods.
  • Increase channel complexity by increasing the amount of large wood in the river channel.
  • Restore and protect the ecological processes that support riparian and meadow communities including naturally high-groundwater levels and sheet flow.
  • Remove impediments to natural hydrology including ditches, berms, and abandoned roadbeds in order to protect and maintain native plant communities.
  • Restore and maintain the function, structure, diversity and productivity of native riparian and meadow plant communities to protect species diversity, ethnobotanical resources and wildlife habitat.
  • Protect and enhance the scenic Outstanding Remarkable Value (ORV).
  • Mitigate impacts to archeological resources.

Learn more about ecological restoration projects in the Merced River corridor.