Current Road and Trail Closures
Work may be occuring throughout the park or on several state roads that may unfortunately cause some closures and delays in the park. While we regret any inconveniences this may cause, these projects will ultimately improve visitor experiences and safety throughout the park.
Trail or Road |
Location |
Description of Work Being Done |
Effects on Travel |
Rend Trail |
Second bridge from the Minden side (1.27 miles from Minden Trailhead or 1.96 miles from Thurmond Trailhead
|
Structural damage to bridge needs to be corrected |
The affected bridge will remain closed for the foreseeable future; hikers or bikers can travel 1.96 miles in from the Thurmond side or 1.27 miles in from the Minden side. |
Keeney's Creek Rail Trail |
Keeney’s Creek Rail Trail at Nuttallburg (closed above the junction with the Conveyor Trail)
|
Trail closed for repairs due to flooding damage |
This trail is currently closed above the Conveyor Trail - visitors can still use the beginning of the trail to connect to the Conveyor Trail. |
Kates Plateau Trail |
Kates Plateau Trail from the Upper Glade Creek Parking Area to the Kates Plateau Loop Trail.
|
Trail is closed due to a dangerous slide
|
A section of this trail near the junction with the Glade Creek Trail is closed due to a slide. |
Fayetteville Trail |
Fayetteville Trail between Park Loop Trail and the Bridge Trail |
Construction of a new footbridge. |
A section of the Fayetteville Trail between Park Loop Trail and the Bridge Trail will be closed from April 15 through April 25 |
Southside Trail |
Near junction with Arbuckle Connector Trail |
A rockslide has occured on and around the trail near the Arbuckle Connector Trail junction. |
The Southside Trail is currently closed near the junction with teh Arbuckle Connector Trail. The rest of the trail remains open. |