Permitting QA Review Checklist

 

DSC Project Permitting Management Process (PPMP)

DBB or DB Predesign (PD)

___
All required deliverables submitted.
___
Scoping documented in the Permitting Assessment Form (PAF).
___
Permit scoping started:
___
The site’s jurisdiction(s) analyzed and ambiguities researched.
___
Topics determined to be part of the project or not part of the project.
___
Permits triggered for each project topic identified and researched.
___
For unknowns, needed resolutions identified and documented.
___
Permitting is consistent in all documents.

DBB or DB Schematic Design (SD)

___
All required deliverables submitted.
___
Permitting is consistent in all documents.
___
All research and basis of decisions documented in the Permitting Assessment Form (PAF).
___
Permit scoping completed:
___
The site’s jurisdiction(s) researched, all questions resolved, and all agencies with jurisdiction identified.
___
All topics determined to be part of the project or not part of the project.
___
Permits triggered for each project topic identified and researched.
___
For unresolvable unknowns, needed resolutions identified and documented.
___
SD permitting meeting held:
___
Final PAF submitted.
___
Draft Permitting Road Map submitted.
___
Contractor-Provided Construction Permits and Design/Government-Furnished Permits determined.
___
Permit Plans needed to be prepared determined.

DBB Design Development (DD) or DB Request for Proposal (RFP)

___
All required deliverables submitted.
___
Permitting documentation provided and clear. Changes in permitting identified and documented.
___
Permitting is consistent in all documents.
___
Acquisition of Design/Government-Furnished Permits (GF Permits) process is proceeding. Schedule/status of GF Permits provided.
___
Contractor-Provided Construction Permits submitted with Division 1 Specifications.

DBB or DB Construction Documents (CD)

100% Draft CD

___
All required deliverables submitted.
___
Contractor-Provided Construction Permits submitted with Division 1 Specifications.
___
Permitting documentation provided and clear.
___
Acquisition of Design/Government-Furnished Permits completed in time to be attached to the Construction Request for Proposal (RFP) and demonstrated on status/schedule document.

100% Complete CD

___
All required deliverables submitted.
___
Acquisition of Design/Government-Furnished Permits completed.
___
Resolution of previous Permitting comments documented.
___
All Permitting critical concerns resolved in documents.
___
No new Permitting critical concerns introduced in documents.
 