3.1 Prepare Request for Proposal (RFP) Based on the Final DB Schematic Design (SD) and Response Memorandum to the Investment Review Board (IRB) review questions, prepare the Draft RFP. Request for Proposal Templates:
Part 4 Technical Requirements Guidelines:
Sample: Design-Build (DB) Part 4 Technical Requirements Sample 3.2 Prepare Contract Price Schedule Prepare the Contract Price Schedule for Design-Build (DB). Template: Contract Price Schedule Sample: third tab of Contract Price Schedule template 3.3 Develop In-Depth & Finalize NPS Constructability Checklist (RFP Comments & RFP Resolution) Identify unique project issues under the RFP Comments (Request for Proposal) column and resolutions to these issues under the RFP Resolution column on the NPS Constructability Checklist. A Constructability Analysis utilizing the NPS Constructability Checklist is required for every project. Template: NPS Constructability Checklist 3.4 RFP Documents Deliverables 3.4.1 Submit 100% Draft RFP Documents for Review
3.4.2 Submit 100% Complete RFP Documents for Final Approval Resolve 100% Draft RFP Documents review comments and incorporate resolutions into 100% Complete RFP Documents. Submit 100% Complete RFP Documents and responses to 100% Draft RFP Documents review comments, utilizing the NPS DSC QA Review Comments form, within 15 calendar days after receiving comments for review and final approval. 3.4.3 Submit Final RFP Documents Resolve 100% Complete RFP Documents review comments and incorporate resolutions into Final RFP Documents. Upon final approval 100% Complete RFP Documents, submit following record set of Final RFP Documents for NPS archiving and general use.
|
Last updated: August 16, 2024