September 24, 2024 Update

September 24, 2024 Posted by: Emily Miller
Steel erection continues at the project site, even as termination dust signals the approaching end of the construction season. As of late last week, the contractor has partially erected the two bays of the truss just east of the centerline, with only the top chord lateral bracing members remaining to install.

A portion of a steel bridge erected on top of a steel launch platform
Portion of the bridge erected on the steel launch platform. Photo credit to Jacobs Engineering/FHWA

The contractor’s goal for this season is to fully erect a minimum of three bays, but they intend to continue working as long as weather permits and may ultimately complete erection on up to five bays (half the bridge) if conditions remain favorable.

Last updated: September 24, 2024

Park footer

Contact Info

Mailing Address:

PO Box 9
Denali Park, AK 99755

Phone:

907 683-9532
A ranger is available 9 am to 4 pm daily (except on major holidays). If you reach the voicemail, please leave a message and we'll call you back as soon as we finish with the previous caller.

Contact Us