July 31, 2023 Update

July 31, 2023 Posted by: Katie Karnes

Last week, the contractor removed the gravel pile from the Ghiglione Bridge pullout and began developing the staging area at Bear Cave (Mile 44.8). Survey work at the Pretty Rocks site has begun and earthworks on the east side of the slide is scheduled to begin tomorrow, August 1.

With more equipment out on the road, there is new, temporary signage around the entrance of the gravel pit near Mile 5 of the road.

Material from a gravel pile is loaded into a dump truck.Removing gravel from the Ghiglione Bridge pullout.
Photo courtesy of FHWA

Heavy equipment on a narrow gravel road. On the left shoulder of the road, a piece of a culvert piece lies in a ditch.Installing a temporary culvert at the Bear Cave staging area.
Photo courtesy of FHWA

Last updated: July 31, 2023

Park footer

Contact Info

Mailing Address:

PO Box 9
Denali Park, AK 99755

Phone:

907 683-9532
A ranger is available 9 am to 4 pm daily (except on major holidays). If you reach the voicemail, please leave a message and we'll call you back as soon as we finish with the previous caller.

Contact Us